What should I do before trades start work on my house?
The short answer
Agree access, parking, working hours, power and water use, and what protection will be in place, and put it in writing with the quote. Most job-site friction comes from things nobody discussed.
TradieAnswers editorial · written in-house and sourced to the authorities listed below
Checked against 5 published sources, listed in full at the end of this page. How we source this
Disputes on small jobs are rarely about the work itself. They are about a damaged floor, a car that could not get out, a dog that got through a gate, or a bathroom nobody could use for a day longer than expected. All of those are cheap to prevent by asking first.
Agree in advance, in writing
- Start date, expected duration, and daily hours.
- Access: keys, codes, whether anyone needs to be home, and who has the number if nobody is.
- Parking and where materials will be stacked.
- Which services will be interrupted, when, and for how long. Water and power outages are the ones that ruin a day.
- Protection of floors, stairs, fixtures and landscaping, and who reinstates what.
- Toilet and amenities arrangements on longer jobs.
- Whether pets and children need to be kept clear, and of what.
Do this yourself before day one
- Photograph the areas the work touches, and the access route, with dates.
- Move anything fragile, valuable or irreplaceable out of the work zone entirely.
- Locate and label the water main, the switchboard and the gas isolation valve.
- Tell the neighbours, particularly about noise, dust and any need to access from their side.
- Confirm insurance is in order, both the contractor's public liability and your own notification if the work is substantial.
Sources
Every source below was fetched and its response recorded on the date shown. Where a government site blocks automated clients, that is noted rather than reported as a successful check.
- Consumer rights and guarantees · Australian Competition and Consumer CommissionChecked 2026-08-10 · responded 200 OK
- Contracts · Australian Competition and Consumer CommissionChecked 2026-08-10 · responded 200 OK
- NSW Fair Trading · NSW Fair TradingChecked 2026-08-10 · responded 200 OK
- Building and renovating · Consumer Affairs VictoriaChecked 2026-08-10 · responded 200 OK
- SafeWork NSW · SafeWork NSWChecked 2026-08-10 · responded 200 OK
Read next
More your rights & checks questions
All 28 →- How do I check a tradesperson is actually licensed?
- What rights do I have if trade work is done badly?
- A tradie has done bad work and won't fix it. What now?
- How many quotes should I get, and how do I compare them?
- Can I withhold payment if I'm not happy with the work?
- Where do I take a building dispute in my state?
- How long is a builder responsible for defects?
- Is a quote legally binding in Australia?
- How much deposit can a tradesperson ask for?
- Do I have a cooling-off period for trade work?
- What can I do if a tradesperson does a bad job?
- What happens if I use an unlicensed tradesperson?