The short answer
A secondary dwelling is a full dwelling in planning terms, so it triggers planning rules on size, setbacks and site coverage, plus building approval, and it needs its own services and drainage.
TradieAnswers editorial · written in-house and sourced to the authorities listed below
Checked against 6 published sources, listed in full at the end of this page. How we source this
The terminology differs by state, secondary dwelling, granny flat, ancillary dwelling, and so does the treatment. What is consistent is that it is a dwelling and not a shed, so it carries the full weight of both approval systems.
What planning usually controls
- Maximum floor area, which is capped in most schemes.
- Whether the lot is large enough, since minimum site areas are common.
- Setbacks from boundaries and separation from the main dwelling.
- Total site coverage and private open space retained for both dwellings.
- Car parking, which is frequently the binding constraint on a small block.
- Whether it can be occupied by anyone or only by a related person, which some schemes restrict.
- Whether it can be separately titled or leased, which is usually the real commercial question.
Where the cost actually goes
- Services. Water, sewer, electricity and often gas have to be extended, and metering arrangements decided.
- Stormwater, which needs a legal point of discharge and often on-site detention.
- Sewer connections, which may need a build-over approval if a main crosses the site.
- Site works, since backyards are rarely level and access for machinery is often poor.
- Fire separation from the existing dwelling and the boundaries.
Sources
Every source below was fetched and its response recorded on the date shown. Where a government site blocks automated clients, that is noted rather than reported as a successful check.
- Do I need a planning permit? · Victorian GovernmentChecked 2026-08-10 · live, but blocks automated clients so the specific page could not be confirmed
- Building Commission NSW · NSW GovernmentChecked 2026-08-10 · responded 200 OK
- NCC Volume Two · Australian Building Codes BoardChecked 2026-08-10 · responded 200 OK
- National Construction Code · Australian Building Codes BoardChecked 2026-08-10 · responded 200 OK
- Before You Dig Australia · Before You Dig AustraliaChecked 2026-08-10 · responded 200 OK
- NCC 2022 Volume Three: Plumbing Code of Australia · Australian Building Codes BoardChecked 2026-08-11 · responded 200 OK
Read next
More building & renovation questions
All 34 →- What should I check before signing a building contract?
- Do I need a permit to build a deck?
- Do I need approval for a pergola, carport or shed?
- Do I need approval for a retaining wall?
- What is an owner-builder permit and should I get one?
- What is home warranty insurance and when is it required?
- What happens if my builder goes broke mid-project?
- How do progress payments work in a building contract?
- What is a variation and can a builder charge whatever they like?
- Can I remove asbestos from my own home?
- Is cutting tiles, concrete or stone dangerous?
- Do I need approval to knock out an internal wall?